top of page

Welkom bij VerseBikes – Een Frisse Blik op Mobiliteit

SOLAR PANEL CHARGING STATION

Prijs

€ 1.980,00

The VerseBikes Solar Panel Charging Station delivers clean, grid-light charging for e-bike fleets and community mobility hubs.
Combining integrated solar panels, charging electronics, and optional energy storage, it supports off-grid, hybrid, or grid-connected configurations for flexible deployment in parks, campuses, business districts, and residential areas.

 

It reduces operating costs, supports sustainability goals, and keeps fleets charged where traditional infrastructure is limited.

CONFIGURATION

Aantal

CORE SPECS

  • Power Source: High-efficiency solar panels with MPPT charge controller

  • Charging Ports: Multiple AC or DC charging points for e-bikes (configurable)

  • Energy Storage (optional): Battery storage for night-time or low-sun operation

  • Capacity: Configurable to support small stations (2–4 bikes) up to larger hubs (8–12 bikes)

  • Mounting: Ground-mounted or integrated canopy structure

  • Connectivity (optional): IoT module for monitoring energy production, usage, and uptime

  • Safety & Compliance: Over-voltage, short-circuit, and surge protection; CE-compliant components

  • Branding & Signage: Custom panels, operator branding, and wayfinding graphics

CONFIGURATIONS

🔑 Essence
Core solar charging for smaller locations.

  • Solar canopy with 2–4 charging points

  • Direct solar-to-charger configuration

  • Basic local status indicators

Momentum
Smart station for fleet depots and mobility hubs.

  • 4–8 charging points

  • Optional energy storage for extended availability

  • Remote monitoring of station status and usage

🚀 Ultimate
Fully integrated charging infrastructure for city-scale fleets.

  • 8–12 charging points per station

  • Connected to the fleet platform for live status and analytics

  • Energy reporting for sustainability KPIs and city partners

PRODUCTION

Standard lead time: 8–10 weeks from order confirmation
(Custom designs and high-capacity stations may require project-specific timelines.)

bottom of page